Jakóbik: Should Poland drop Korean atom?
The construction of Poland’s second NPP together with South Korea could be put on hold. This solution is a double-edged sword – writes Wojciech Jakóbik, editor-in-chief at BiznesAlert.pl.
The construction of Poland’s second NPP together with South Korea could be put on hold. This solution is a double-edged sword – writes Wojciech Jakóbik, editor-in-chief at BiznesAlert.pl.
Włocławek is probably the second proposed location for Orlen Synthos Green Energy’s small reactors. Cooperation on this project has so far survived the political turmoil – writes Wojciech Jakóbik, editor-in-chief […]
The U.S. embassy says U.S. companies can build one reactor a year in Pomerania. This means that the entire plant can be ready as planned in 2037, even with a […]
„Considering fuel security in the new tense geopolitical conditions and what is happening in Ukraine, it is necessary to keep as big reserves as possible in ready – made fuels,” […]
„At the end of 2023, the government submitted a draft amendment to the legislation on wind farms, which was met with considerable criticism. The Climate Ministry has announced a wind […]
PERN, Mostostal Warszawa and Mostostal Płock have signed a contract for the construction of three diesel fuel tanks in Dębogórze in order to expand the local fuel depot, which is […]
Prime Minister Donald Tusk announced the buffer zone on the border with Belarus would be restored. At the same time, he pledged greater support, including equipment and legal means for […]
The Government Plenipotentiary for Strategic Energy Infrastrcuture Maciej Bando revealed at the Committee on Energy in the Sejm that the European Commission’s approval of the model for financing the atom […]
Orlen’s new management remains interested in the Schwedt refinery, but the ball is in Germany’s court.
Prime Minister Donald Tusk announced that the government launched the East Shield Project . It includes building fortifications of the eastern border that will cost PLN 10 billion. Poland follows […]