Gaz-System is preparing a gas pipeline for the 3Cs initiative
An almost 1 km long gas pipeline will be installed under the San river using the technique of horizontal directional drilling (HDD). The upcoming drilling process is one of the biggest challenges for GAZ-SYSTEM in the construction of the Hermanowice-Strachocina gas pipeline.