Polish Briefing: Enea’s RES investments I Tauron splurges on grid I Biogas Plants Act amended by Senate

Enea supports the development of RES in north-western Poland Each month the number and capacity of renewable energy sources connected to the Enea Operator network is growing. Currently, more than 158,000 sources with a capacity exceeding 4.7 GW are connected to the company’s grid. In 2022, Enea added almost 42,000 renewable installations with a capacity […]

Polish Briefing: Rosneft saga in Germany continues I Poland’s only reactor to be modernized I Russian oil still sold in southern Europe

Germans remain silent about derusfying Schwedt, but signed a contract with Kazakhstan The Schwedt refinery has signed a time-limited contract for oil supplies from Kazakhstan. It is not known whether this facility will be derusified and Poles are concerned that the raw material billed as Kazakh is physically from Russia. The Schwedt refinery in Germany […]

Jeziorowska: It is not as easy as Brussels thinks to make the Polish heating industry green (INTERVIEW)

Among the EU institutions, there is often a mistaken belief that such large heating systems as the ones in Poland can be easily greened by eliminating the heating network and installing heat pumps powered by electricity from renewable energy sources in all buildings. This conviction couldn’t be further from the truth – says Dorota Jeziorowska, […]

Polish Briefing: Germans reluctant to shake off Russian oil firm I Gaz-System’s VP member of GIE board

Reuters: Poland urges Germany to speed up Rosneft’s exit from Schwedt refinery According to Reuters, Poland’s Climate Minister Anna Moskwa said that „Germany needs to speed up the sale of Russian energy group Rosneft’s majority stake in the Schwedt refinery for Poland to deliver in full on a crucial supply deal for the refinery”. Refinery […]

Report: A busy week for Poland’s atomic projects

After last year’s preparations, which included selecting the technology for Poland’s first NPP and choosing the location for small reactors, the time has come to face the red tape. Reactors are not built without meeting environmental and safety standards, and these are verified by the relevant administrative bodies.

Polish Briefing: Poland is 5 million tons of diesel short I KGHM’s small reactor project I Orlen and Synthos inch towards an SMR near Oświęcim

Orlen: 5 million tons of diesel is missing in Poland „In Poland, there is a shortage of about 5 million tons of diesel and it needs to be imported,” said Marek Wocial from the PKN Orlen Wholesale Price Coordination Office. He added that too little fuel on world markets has caused prices to rise even […]

Loading