Radomski: Too early to celebrate SMRs from the US in Poland

The American NuScale has received certification for a small 50 MW nuclear reactor. However, this does not yet mean a breakthrough for 77 MW, which Poland’s KGHM is counting on. Unresolved problems may return on a larger scale and take months – or years – to resolve – warns Daniel Radomski, contributor to BiznesAlert.pl.

Faster trains need more power. How to power HSR? (ANALYSIS)

Poland, in pursuit of western Europe, wants to build a high-speed rail network, but a much higher speed of trains involves the consumption of significantly more power. The 3 kV DC system used by the Polish railway network is incapable of providing it in such amounts. The issue of powering high-speed rail (HSR) with 25 […]

Radomski: A revolutionary strategy of the Polish grid operator (ANALYSIS)

An onshore high-voltage, direct current electric power transmission cable (HVDC) is the most spectacular proposal included in the draft Grid Development Plan prepared by Polskie Sieci Elektroenergetyczne (PSE, Polish grid operator). The document provides many analyses and a lot of key information about the future of the Polish power industry. It also heralds huge changes […]

Ładowanie…